I’m a little behind on my self-imposed schedule to complete the polishing edit on BECOME: TO CATCH THE LIGHTNING.
Well, I always knew that was a stretch goal, so no great surprise there. I still hope to finish it today.
Then on to formatting for the final Amazon version and the one for Draft2Digital, including doing a bit more work on the D2D author page, so I can include a link to that in the back matter. As time permits, I’ll upgrade the back matter in my other works distributed through D2D, too.
I’ll be working on the blurb some more, too. At least I’ve come up with a tag line:
He could become a god. He could just burn to death. Maybe he’ll wait on that.
Then the print book, not that I’ve ever sold that many print copies.
And back to work on BECOME: TO RIDE THE STORM. I’m getting a little itchy to get back to that one.









Leave a Reply